The Lowdown On Commercial Heating

Posted on November 25, 2015, at 9:27 am

During the design phase of a large construction project, heating and cooling needs are determined, and engineers arrange a network of ducts, diffusers and returns for optimum performance. Depending on the building and area climate, commercial heating system installation may call for a specific type of unit.

Energy calculations are a big part of the design and engineering process. An accurate estimate as to power consumption will give the building owner a sense of the ongoing demands and their costs. This also gives engineers the opportunity to look for ways in which they can conserve more. No matter what, when the numbers are accurately crunched, correct sizing for chillers and boilers ensure that the system runs efficiently and meets the needs of the building and its occupants.

During construction, commercial heating system installation often overlaps with electrical and mechanical work. The process includes travel through tight spaces and customization of materials, such as the bending and cutting of sheet metal. Temperature and humidity are measured at various points and test results can reveal potential for fine-tuning.

After a system is working optimally, a technician will note any changes made to the plans so that an as-built can be developed. This schematic will assist maintenance staff to schedule and carry-out service plans. If further design changes are necessary, field staff will sometimes consult with an engineer to ensure that good results are had. If engineers need more information to make recommendations, they will make a site visit to understand what options exist.

Commercial heating system installation goes smoothly when the building owner is well informed and in-the-loop during all phases of the process. If you choose a company with a record of successful integration, your project will continue moving until that long-awaited day of completion.